Technical library
The Megger technical library provides access to a range of additional content and resources such as technical guides, application notes and more. Use the filters to browse specific content (e.g. application notes) or refine your search to a particular electrical application area.
If you would like to see the content we have available on a particular subject or need to locate some software, simply enter a search below. Please note, you will need to create an account to access some resources.
Filter by application type:
Insulation resistance testers above 2.5 kV
Electrical insulation degrades over a period of time because of various stresses which are imposed upon it during its normal working life. The insulation has been designed to withstand these stresses for a period of years, which would be regarded as the working life of that insulation. This often runs into decades.
Published: 16 June 2021
Download PDF
Case study: True dynamic resistance measurement
Pinpointing concealed problems inside a resistive-type OLTC before physical inspection - the application of true DRM.A maintenance team at the Electric Power Transmission Network in the City of Karbala performed routine electrical tests on a transformer including: winding resistance measurements (WRM), transformer turns ratio (TTR), short circuit impedance (SCI), excitation current, and line-frequency power factor (a.k.a. dissipation factor or tan delta). This case study looks into their investigations and their results.
Published: 15 June 2021
Download PDF
FREJA
Software download files for FREJA
Published: 28 May 2021
Download
Less is more for electrical test instruments
A 21st century trend in electrical instrumentation has leaned toward smaller, lighter and easier to manipulate testers through microcircuitry. Being portable and easy to manipulate can be beneficial enough, but there’s much more to it. Size reduction is not just for ease of manufacturing or an advertising gimmick. Multiple instruments can be combined into a single handheld tester, so that an entire job can be completed with a single piece of test equipment. The user can benefit from notable cost savings and job improvement. This article will examine how many of the functions found in multiple different instruments can be included in just one handheld tester.
Published: 26 April 2021
Download PDF
Case study: BSES Rajdhani Power India
Electrical maintenance departments are often faced with the challenge of performing different tests on instrument transformers according to official standards and within a limited shutdown time. This is made even more difficult when multiple instruments are needed to perform all the required tests.
Published: 7 April 2021
Download PDF